Engagement formats built around each phase of your project

Whether you need a planner for three weeks or eighteen months, on-site or remote, the assignment format adapts to your context — not the other way around.

Our specialities

A dedicated page for each type of need

Depending on your context, the right angle isn't the same. Choose the speciality closest to your need:

Primavera P6 Planning Consultant

Building, recovering or auditing a P6 schedule — for a need centred on hands-on tool expertise.

Learn more →

Project Planning Expert

Tool-agnostic planning methodology — to structure or diagnose a planning function.

Learn more →

Owner's Engineer

Independent owner-side schedule control, to challenge contractor and supplier schedules.

Learn more →

EPC Planning Engineer

Multi-package schedule coordination on Engineering-Procurement-Construction programmes.

Learn more →

Project Controls Freelance

Tool-agnostic scheduling, cost integration and risk tracking, plugged into your reporting cycle.

Learn more →

Schedule Delay Analysis

Forensic delay analysis (TIA, Windows Analysis) for claims, disputes and EoT requests.

Learn more →

Project start-up

Setting up the master schedule, structuring the WBS, defining contractual milestones and the tracking baseline from the first weeks of the project.

Activity peak

Temporary reinforcement of your planning team when workload exceeds internal capacity — intensive engineering phase, multiplication of work packages, or demanding reporting during a critical period.

Backup assignment

Targeted intervention on a specific deliverable: recovering an existing schedule, reliability audit, preparation of a management review, delay analysis.

Long-term engagement

Senior planner embedded in your project team for the full duration of the site or programme, working directly with the project director.

On-site

Physical presence to lead schedule reviews, chair coordination meetings with work packages, and provide direct reporting to the project director.

Remote

Off-site intervention for assignments that don't warrant physical mobilisation — periodic updates, schedule data analysis, support to a project manager already in place.

Method

How an assignment runs

  1. Scoping the need

    Discussion of the project context, expected duration, tool in use, and level of autonomy required.

  2. Profile selection

    Mobilisation of the lead planner or a network profile, chosen for the tool expertise, language, and availability required.

  3. Mobilisation

    Assignment starts on-site or remotely, within a timeframe compatible with the urgency of your need.

  4. Follow-up & reporting

    Single point of contact for the full duration of the assignment, with the setup adjusted if the need evolves.

Tools we master

Multi-tool expertise

Primavera P6 MS Project / Project Online Planisware Power BI / reporting Delay analysis

Which format fits your project?

Let's talk about your timeline, your tool, and your region of operation.

Discuss your need