Real assignments, demanding contexts

For contractual confidentiality reasons, the examples below are anonymised. Specific references can be shared on request, under NDA if required.

Construction — Europe

Emergency schedule recovery

Context
Multi-package real estate programme, master schedule left outdated after months of undetected slippage.
Assignment
Full audit, schedule rebuild in Primavera P6, and a weekly update cadence put in place.
Outcome
Visibility on contractual milestones restored within three weeks.
Energy — Gulf

Engineering peak reinforcement

Context
EPC project with a sudden surge in engineering headcount, schedule no longer tracking the required level of detail.
Assignment
Remote senior planner mobilised to support the local team over three months.
Outcome
Weekly reporting made reliable again, engineering-phase milestones held.
Infrastructure — Europe

Master schedule start-up

Context
Public infrastructure project at launch phase, no structured planning baseline in place.
Assignment
On-site build of the WBS, master schedule and contractual milestone baseline.
Outcome
Baseline approved by the client and adopted as the tracking reference for the full project.
What clients say

Assignment feedback

"The schedule was back under control within days, on a project we'd let drift for months. The level of rigour was exactly what we needed."

Project Director, Construction sector — Europe

"A single point of contact for the entire assignment, available across our hours despite the time difference. Simple, direct, effective."

Planning Manager, Energy sector — Gulf

Testimonials collected from clients; names and companies withheld under confidentiality agreements.

A comparable context to yours?

We can put you in touch with a reference client, subject to their agreement.

Discuss your need